After dropping off its helper from a push up Duncan Hill NS 112 departs the westend of Duncan as it heads west.
NS 114 reaches the summit of Duncan Hill as it heads west with its GP38-2 leader.
A freshly painted SD70M-2 and a primered Dash 9 has crested Duncan Hill with westbound 112 as they wait for an eastbound.
NS 112 heads west with a SD70M-2 up front through Georgetown Indiana.
A lone BNSF SD70ACe leads NS 23J empty autoracks west over Georgetown Creek on its way to Princeton In.
NS B23-7 4003 has just tackled Duncan Hill as it leads westbound train 89 near Georgetown In.
NS 168 heads west at Georgetown In. with an unusual 4 axle leader for this part of the country.
NS GP40X 7000 has just completed leading westbound 61A up Duncan Hill. As the train waits for an eastbound its conductor walks across the street for something to eat for the trip. GP40X 7000 was... (more)
NS SD70M 2599 leads 285 east across Georgetown Creek near the namesake town.In a few miles it will begin its decent down the 2.8% grade of Duncan to the Ohio River valley.
NS train 375 sits at the west end of Duncan while they wait for the helper to cutoff and to get a signal to continue west.
NS SD70M-2 #2672 and a C40-9W power wesbound train #375 at Georgetown,Indiana. The headend of the train has just exited the west end of Duncan Tunnel, which is nomore than 50 yard behind the power... (more)
train 112 with 3 UP units waits to meet 167 and D10 at the west end of Duncan siding
NS 9264 crosses the spectacularly long bridge that bisects Georgetown