CP 2816 Express train Arrives at Streetsville GO taken 8-11 years ago. If anyone has ANY information on this please send me a message as I dont remember anything of it!
Realigning the switch is what the conductor on the Orangeville Brampton Railway is doing after setting off 9 cars and lifting 2 on the CPR interchange track in Streetsville.
CP's Streetsville turn heads back south down their small section of trackage on the Owen Sub after switching some boxcars at a local industry. The OBRY was held up behind the spur they were in wha... (more)
GO 151 making a station stop at the new Lisger GO station with Cab Control car 247 leading 11 other bilevels and GO 601
CP 141 about to pass the new Lisger GO station on CP's Galt sub @ 17:59 with CP 8226 - CP 8223 and 13 empty frame flats. This train is on it's way back to St. Thomas after having delivered a train... (more)
Westbound at Streetsville GO Station, CP 9664-9557-6050 lead 241 around a curve on the sometimes busy Galt Sub, right before a work block goes in place further east and creates a lull in traffic.
While a crew member closes the knuckle at the end of her set off, CCGX 1000 runs around the interchange track to couple on to the lifts on the other end of the caboose at the CP-OBRY interchange i... (more)
CP 57G starts out of Streetsville GO Station after making there station stop, passing by piles of discarded railway ties on there way to Milton.
Still looking good in her beaver paint scheme, CP5791 leads 3 of her own sisters westbound through the intermediate signals at Streetsville.
CP 198 leans into the highspeed curve at Streetsville behind CEFX 1054, CP 8244 in new paint and 9660.
OBRY GP9 1000 pauses at Streetsville as the engineer starts to kick away the snow from the front of the locomotive after encountering a huge snow drift in Orangeville.
CP 9772 leads the American Holiday train on its run thru Canada bound for Cambridge and London Ontario.
Giving the 2816 a little care and attention during the first stop in Streetsville.