A ballast train is running the "Lioran pass" line with the old volcanic mountain in the background named "Puy Griou".
A ballast train is running the "Lioran pass" line with the old volcanic mountain in the foreground named "Puy Griou".
Clearing the line from Aurillac to Neussargues, the snowplow has just reached the summit of the line at the Lioran station (3780 ft). The water tower that was in service during the steam era is a ... (more)
Clearing the line from Neussargues to Aurillac, the snowplow has just reached the summit of the line at the Lioran station (3780 ft).
A snowplow clearing the Neussargues - Aurillac line has just reached the summit of the line in the Lioran station. In the background the water tower that was in service during the steam era is a p... (more)
The SNCF Infra engines are hauling a loaded ballast train from Neussargues to Aurillac.
The SNCF Infra engines are hauling a loaded ballast train from Neussargues to Aurillac..
The SNCF Infra engines have just left Clermont-Ferrand with a loaded ballast train to Aurillac.
The SNCF used this snowplow to clear some of the line between Mende and La Bastide.
After a good storm the SNCF used this snowplow to clear some of the line between Neussargues and Aurillac.