Today's Everett garbage loads have reached the end of two main tracks at Mt. Pleasant. The train will now traverse the Columbia River Gorge on BNSF's Fallbridge Subdivision.
After meeting a westbound, three SD75Ms move the loaded Everett to Roosevelt, Washington garbage train out of Melonas siding in the Columbia River Gorge.