On their second trial run to Melbourne, brand new hired LDP (Locomotive Demand Power) Downer EDI/EMD-built LDP001 and LDP002 lead CLP10 CLP12 and CLF1 through Marulan on the 7BM7 QR Nationals Bris... (more)
On their second trial run to Melbourne, brand new hired "Locomotive Demand Power" Downer EDI/EMD-built LDP002 and LDP001 lead dead attached CLP10 and CLP12 on the 7MB7 QRN service from Melbourne t... (more)
On their inaugural visit to Melbourne, the first two of Downer EDI's "Locomotive Demand Power" fleet of nine lease locomotives for QR National depart North Dynon on the return portion of their tri... (more)