Eastbound tonnage grinds up San Timoteo Canyon near El Casco.
UP 7409 east works hard up grade between El Casco and Hinda with a heavy manifest in tow.
UP's hot ZLCAT works upgrade near Hinda with a long cut of Tropicana refers on the head end.
Working up Beaumont Hill at the Live Oak Canyon crossing, 4 EMD's lug a long stack train up San Timoteo Canyon.
UP 7605 and newely delivered 7944 lead a eastbound stack train near Beaumont.
Working upgrade between Ordway and El Casco, this eastbound heads east with a mixed bag of motive power.
UP 7396 brings up the end of a fleet of Eastbounds this morning as it works through San Timoteo Canyon.
Eastbound stacks pass through the sweeping curve as it nears the summit at Beaumont.
Eastbound stacks pass through the Hinda crossovers as the train nears Beaumont.
Eastbound ZLAMQ works through El Casco in San Timoteo Canyon.
UP 8717 leads a eastbound stack train up grade through San Timoteo Canyon.
A typical mid 2000's UP lashup with pool and lease power working east up San Timoteo Canyon.
UP 8686 east leads a K-Line stack train up grade between Ordway and El Casco.
On its first run west, UP 8711 leads a KG1LAC along the Yuma Sub, as it decends the grade through San Timoteo Canyon.
A loaded tie train decends the grade through San Timoteo Canyon near Ordway.