It is 7.05 PM and minus 8 Celsius (17,6 F) , the full moon has risen and illuminates the mountains in the background, the Piz Arlas (left), the Munt Pers and the Diavolezza area. Along the banks o... (more)
Heading up the High Line Copper Basin Railway’s Smelter Job powered by EMD GP39 No. 401 pushes ore cars up the hill out of Hayden Junction to the Arsarco Smelter complex at Hayden, Ari... (more)