Re 460 # 005 in publicity paint scheme for THALES is pulling the Interregio 2414 from Chiasso to Zürich over the Intschialpbach viaduct at Intschi.
Practise run of the new "Gottardino" train, timetabled from august 2nd, running through the world's longest railway tunnel, the 57 km long Gotthard Base Tunnel, from Flüelen to Biasca, ... (more)
Re 460 # 098 in the "Gottardo 2016" paint scheme (opening of the Gotthard Base Tunnel) is pulling the Interregio 2414 from Chiasso to Zürich on the uppermost level of the loops at Wasse... (more)
The SBB Re 460 098, painted in the publicity paint scheme for Gottardo 2016 (Gotthard base tunnel opening), is leading IR 2414 from Chiasso to Zürich HB.
On 1st june 2016, the world's longest railway tunnel, the 57 kilometer (about 35.8 miles) long Gotthard Base Tunnel between Rynächt (north of Erstfeld, Uri) and Pollegio (south of Bodio, Ticino) ... (more)
The Gotthard Base Tunnel test train passing Rotkreuz after being stationed at Fluelen for a few days.
On 1st june, the world's longest railway tunnel was officially inaugurated, the 57 kilometer long Gotthard Base Tunnel through the Alps from Erstfeld to Bodio. This is the first train for politici... (more)
Since november 2015, Re 460 028 has a publicity paint scheme for SBB train crews.
" ABB - Gottardo 2016 " special Paint
" Credit Suisse - Gottardo 2016 " special Paint
" Wir sind unterwegs für Sie " special Paint
IR 2251 from Basel to St. Gallen with the leading locomotive Re 460 072.
Re 460 # 001 "Lötschberg" with the empty train 28541 from Aarau to Brugg (AG) between Wildegg and Holderbank, with Wildegg castle from the 13th century.
Re 460 # 085 with "Gottardo 2016/Coop" publicity paint scheme with an Intercity on the Hauenstein line between Gelterkinden and Tecknau.