After stopping to let crews perform an inspection, the J-Class #611 builds up a head of steam as it rolls under the milepost 316 intermediate signals at Lexington.
NS 957 shoves back around the north leg of the wye at Salisbury after having to stop and pull back forward due the 611 engine and tender not being able to make it around the south leg of the wye.