High winds overnight likely drifted onto the steps and plow. as opposed to high snow on the tracks.
The afternoon of New Year's Eve finds quite a few motors in waiting.
Snowing hard on the servicing area of the yard. The control tower is in the distance.
Warming up the engine to start clearing some switches as a heavy snow falls.
A few different paint schemes are seen here, about a week after a blizzard.
Rear DPU on one of many coal empties tied down on the afternoon of Christmas Eve. A light rail train moves south in the background.
Two days after a heavy blizzard covered eastern Colorado.
Denver-Laurel manifest, about to head north on the Front Range subdivision.
Built in Canada in August 2006.
Engineer squeezes out of the window to better see his crewman's hand signals.
A line of light rail vehicles waits at the new Elati shop for the opening day of the southeast line in November.
Three narrow gauge engines work this train up the hill from Lobato Trestle during the "Chama Steam 5" event.
This narrow gauge engine simmers in the yard, waiting for another run up the 4% grade the next day.
Three K-36 class engines under steam, ready to take an end of season special up to Cumbres Pass the next morning.