Running slightly late, DQ2003-DQ2007-DQ2005-D2020 cross the Blythe River. The D was taken off 32 after hitting a cow at Railton, and was hitching a ride to Burnie to help power train #31.
Babaranjang trainset, longest indonesian trainset
Running about 4 hours late, train 7-36 passes through the cuttings on the Burnie side of Penguin. The train was running late due to a fault with the independant brake in 2113.
westbound Desert Wind passes thru Cajon on way to Los Angeles
eastbound Desert Wind passes thru Cajon Summit
Eastbound Desert Wind passes thru Cajon