CBR 301 (ex SCL) GP40 is making its first revenue run on the southbound OT-1 at Kelvin, AZ (near Ray Jct.). Unit was delivered to the CBR at Magma Jct on Jan 9, 2012. CBR installed a radio and add... (more)
A long way for Appalachia, former C&O GP39 3916, now Copper Basin 505, leads CBRY GP39-2's 502 and 403 on southbound ore loads past the sidings at Ray Jct. It would seem that the draw of the tunne... (more)
The first inbound loaded ore train, symbol OT-1, passes through Tunnel #2 on the way to Hayden, AZ. Hayden is the location of the ASARCO smelter, where the copper ore contained in this train is un... (more)