RS30 hammers the switches at Farm 1 heading out to Prima Asphalt.
The 30 shoves in some centerbeam flats for unloading at Nassau-Suffolk Lumber, which is no longer a NYAR customer at this time. The siding is now derelict and has been taken back by the elements.
The nighttime job RS 50 was unable to switch Roberts Plywood. In daylight we see the RS 60. The 261 is backing into the spot, behind the photographer, to leave loads and remove empty boxcars of pl... (more)
RS30 finishes up at Medford Team in some sweet fall foliage.
The RS30 shoves downstairs to Fresh Pond yard after picking up some loads from the CSX Fremont Interchange.
The RS40 heads to Pine Aire to pick up some cars. Today they are running double ended and the 268 is on the opposite end. Although the train was traveling away from me, to expedite the move, this ... (more)