Westbound intermodel AYMO passing Athol.
The last SD39 on the roster leads a colorful NMED into East Deerfield yard.
The first Pan Am painted unit leads eastbound (Selkirk, NY/East Deerfield, MA) train SEED thru Shelburne.
AYMO splits the approach signals for CPF 353 at South Royalston.
Westbound AYMO passes the former B&M yard at Athol.
Empty rack train FIMO knocks down the block signals at Shelburne.
AYMO rounding Wachusett curve West Fitchburg.
Eastbound road job RJED eases thru a speedo at Charlemont.
Westbound AYMO blasts thru Shirley.
Westbound intermodal job AYMO passes the P&W interchange yard at Gardner.
Southbound Conn River job EDPL approches Dooleys crossing in Deerfield.
Approching the town line with Westminster, AYMO rounds Wachusett curve, the future site of the new MBCR Wachusett station.
Two leased NS units lead RUED's power out of the recieving yard at East Deerfield, and head for the house.
A leased NS unit is today's power for the Fitchburg local. Seen here assembling power at CPF WL.
RJED with HLCX 7182 and MEC 604 lead 63 cars along River Rd.