Here is the switcher lineup at South Plainfield yard on March 6, 1976. NW2 181, SW900 122, and two other switchers await their next assignment. In the background is the new yard office, a pre-fab... (more)
Built in April 1948, Union Pacific NW2 1083 is looking good in the railroad’s latest paint scheme, which features the railroads shield on the cab. UP 1083 has retained its original single chime... (more)
In April of 1983, Conrail 9232, an EMD NW-2, is working for its third owner. It was originally built in 1949 as Erie 425, and then became the Erie Lackawanna 425. Shown here, working the QD yard j... (more)