The GP20C-ECO is another variant in EMD's repower catalog originally launched in 2008. CP used GP7u's and GP9u's for these rebuilds. As a cost saving measure they are built to Tier 0+ standards.... (more)
Between February 1939 and December 1949, 1145 of these 1000hp switchers were produced. Most ran in the US, this is one of 20 exported to Canadian National.
Switching at the industrial sidings in south east Edmonton serving the Rio Tinto Alcan petroleum coke calcining plant are GP9 CN 7213, GP40-2 CN 9581 and GP38-2 CN 4781 (Renumbered from 5581)