A variety of BNSF paint schemes lead this mixed freight past the historic Pueblo Union Depot.
Loads of scrap steel leave the Pueblo Yard on the "Hill Cut" job as it heads to the former CF&I steel mill while a winter snow storm rages in the background.
This Colorado & Wyoming Bicentennial GP7 looks great in the morning light on the shortest day of the year.
A loaded coal train zig-zags its way through the BNSF Pueblo yard with Pikes Peak looming in the background.
After working Rocky Mountain Steel, this leaser heads into the UP (D&RGW) Pueblo Yard.
7128 7069 7211 5507 5373 5388 bring a southbound BN coal train into the AT&SF yard, Pueblo, just before sunset in September 1981
5519 8018 5200 5110 5038 5536, all elephant style (cab ahead), power a southbound coal out of Pueblo in September 1985
3212 3070 3181 pass the old depot as they depart Pueblo on an eastbound freight.
A yard consist of GP40-2s goes about sorting cars while a coal train gets tied down on the left and construction of a new overpass starts in the background.
A BNSF mixed freight awaits the passing of a UP freight with the Pueblo public library looming in the background.
A trio of GP40-2s gets ready for today's yard shenanigans.
A yard consist with two fallen flag paint schemes stands ready to sort cars in the adjacent UP Pueblo yard.
Two visitors from the South help to lead this BNSF freight train out of the BNSF Pueblo yard and on towards La Junta.
The DPU of a loaded coal train passes under the Main Street bridge on its way into the UP Pueblo yard.