After being refueled and with a new crew aboard, the NS 233 heads out of the yard on main 2, passing the yard job, which is currently shoving back into the yard, on main 1, under the classic CPL.
With a pair of SD70M-2s for power, the NS 233 pulls off of main 2 at CP Craft, onto the Lockbourne siding to prepare to work the Rickenbacker Intermodal Terminal.
I was hoping to get a photo of NS 233 with doublestacks exiting Roderfield Tunnel but 5 motors will do. I'm glad it worked out like this because the first serveal cars were single stacks today.
Heading west on the eastbound main, the NS 233 heads through the Hutchins Ave grade crossing, and under the very large former NW cantilever signal. Makes me wonder how many more tracks were in thi... (more)
The NS 233 rounds the bend behind the Scioto County Sheriff's department, as it approaches the US 23 overpass, on route to work the intermodal terminal in Columbus.