UTAH 5001 leads a four unit set at the point with another five units in the last third of this coal consist, help make the steep grade.
UTAH 5001 rolling down the pass.
MPI replaced Caterpillar engine with EMD 16V-645F prime mover. It was westbound at Castle Gate.