A PHL Dock Job shoves down Track 2 on the Pier J Lead in the Port of Long Beach bound for the Pacific Container Terminal. On the right, another Dock Job prepares to depart for Pier W out of the Lo... (more)
Lite power heads to Rioco to pick up a stack train as they pass a variety of old containers stacked up alongside the right of way.
A loaded intermodal repo approaches the LA River Bridge on the San Pedro Sub, bound for Terminal Island. The train is traveling on what was once UP's mainline to the LA/Long Beach Harbor, but is n... (more)
One of the PHL BNSF Dock Jobs switches out cars at the Pacific Container Terminal inside the Port of Long Beach as a group of vessels wait their turn outside of the Harbor. On the right, a couple ... (more)
YPBN15 (left) enters CP-Gaspur on its way to Terminal Island from LBCT as YPSW14 (right) switches Pier B Yard as a clear summer afternoon.
A Pacific Harbor Line BNSF Dock Job brings 108 loaded platforms from Pier E in the Port of Long Beach behind a single MPI rebuild bound for Terminal Island to be assembled into a road train.
Metro Ports' still new genset sits with a cut of loaded Trona cars, awaiting a chance to pull them through the aggregate loader. Photo taken with permission and in full PPP.
A PHL Dock Job passes a sea of stored containers as they pass CP-Farragut after spinning their train of containers out of APL.
The YW304J auto transfer switches cars at 9th Street in Long Beach. This is a new BNSF job, symboled Y-WAT3041 on home rails and known as the "742". It breaks down and builds cuts of autos between... (more)
UP GP30 No.719 and GP30B No.736B. A Mike Bledsoe Photo.
The PHL 1400 Switcher switches Toyota and Lexus autos at Pier B in Long Beach with Progress Rail EMD24B demo unit PRLX 24 leading.
The PHL 1400 Switcher drills out autos at Pier B with one of the GP22ECO demonstrators for power.
GE Evolution series A1A configuration catched early in the morning at the end of tracks, from a reflection caused by a little flood over Nimitz Rd.