DMIR 203 pops out from the foliage
DMIR 203 turns the corner ready to go to the docks.
A trio of 38's glide down Proctor Hill.
Proctor Roadswitch spots ore cars on the dock while the St. Clair unloads limestone.
Proctor Roadswitch spots ore cars on the dock while the afternoon job arrives with cars for limestone loading.
200 heading off of Dock 6 with empties in the late afternoon.
Afternoon Proctor Roadswitch with "filler" cars for E-rail trains at Steelton.
Afternoon Proctor Roadswitch departs its namesake with E-rail "fillers" for Steelton.
The Proctor Roadswitch takes ore loads to Duluth as storm clouds form in the distance.
Proctor Roadswitch with loads for Dock 6.
Veteran rebuilt SD-M leads the Proctor Roadswitch through Saunders Junction (BNSF overhead).
A trio of 400s lug 24 loaded limestone cars up Proctor Hill.
A Proctor Roadswitch works the Lakehead Storage Facility.
Three big 400s have no trouble handling 25 loaded cars of limestone up Proctor Hill in fresh snow.