2ZAGAL # 009 is pulling train # 24 from Ulaanbaatar to Beijing (1548 kilometer) on the transmongolian railway between Chairchan and Choolt southwards. The first two cars are from the mogolian MTZ ... (more)
Delayed southbound train 272 from Sukhbaatar to Ulaanbaatar with 2ZAGAL # 010 and M62UMM # 001 near Batsumber.
2ZAGAL # 003 twin locomotives are pulling the long 27 cars train 276 from Ulaanbaatar to Zamiin Uud (near the border to China, 709 kilometer from Ulaanbaatar) through the Omega shaped Khonkhor loo... (more)
Only one half of a 2ZAGAL locomotive, # 009, is pulling the famous 11 car train # 4 "Trans Siberian Express" from Moscow to Beijing (7622 kilometers) through the loop of Khonkhor. It is sunday mor... (more)
Train 275 of the Mongolian Railway from Zamiin-Uud to Ulaanbaantar (709 kilometer in 15 hours 20 minutes) is a long 27 cars train, pulled by 2ZAGAL # 003 in the Khonkhor omega-shaped loop. The tra... (more)
2ZAGAL # 008 with train 281 from Ulaanbaatar to Zuunkharaa near the stop at Kilometer 324.
Double diesel locomotive 2ZAGAL # 010 is running the long 27 cars northbound train 275 of the Mongolian Railway from Zamin Ud (Chinese-Mongolian border) to Ulaanbaatar between Choolt and Chairchan... (more)
Northbound freihgt on the transmongolian line over Baian pass with locomotive 2ZAGAL # 008. This twin locomotive was rebuilt on bogies, frames and cabs of russian 2TE10, with a new power unit from... (more)
This religious site is called an Obo, in honor of gods and good spirits. In the background a southbound freight with 2ZAGAL # 004 locomotive is waiting to proceed from Emeelt.
Under the light of the full moon, passenger train 22 of the Mongolian Railway from Ulaanbaatar (Ulan Bator) to Erlian (border station Mongolia/China), pulled by 2ZAGAL locomotives (rebuilt by Gene... (more)
A unkown 2Zagal with the passenger train 281 Ulaanbaatar-Suuncharaa in the evening.
Scandinavian scenery in the Mongolian spring. Please join our fantastic railfanning photo tours! monrailpic@gmail.com Monrailpic Tours