Durango & Silverton 480 rounds the horseshoe curve on The Highline with its mixed train on a sunny May afternoon.
The Molli steam locomotive 99 2323-6 is undergoing a general overhaul at the steam locomotive works in Meiningen, seen here the connection test from the boiler to the main frame, and a worker is p... (more)
The Molli steam locomotive 99 2323-6 is undergoing a general overhaul at the steam locomotive works in Meiningen, here the connection process of boiler and ash pan, the main frame is seen in the b... (more)
Denver & Rio Grande Western 491 steams out of the roundhouse on a sunny May morning.
Durango & Silverton 480 emerges from one of the many rock cuts at Rockwood with its passenger train as it returns to Durango.
Durango & Silverton 473 and 480 start the steep climb up Hermosa Hill on a sunny May morning.
The engineer leans out the window and receives a blast of chilly September air to the face as he rounds the final bend before the US Rt 50 bridge.
An afternoon train, pulled by the steam locomotive newly built in 2009, travels to Bad Doberan, past the blooming rapeseed fields on both sides of the tracks near the Fulgen horse farm
East Broad Top 16 on the Rockhill Turntable.
EBT 16 taking on sand at the shop track lead.
Surrounded by her sister mikados, East Broad Top 16 rolls into the roundhouse at Rockhill Furnace.
An afternoon train, comes back from Bad Doberan, past the blooming rapeseed fields on both sides of the tracks near the Fulgen horse farm
The morning train, pulled by the steam locomotive newly built in 2009, travels to Bad Doberan, past the blooming rapeseed fields on both sides of the tracks
EBT 16 Eases into the historic Rockhill Roundhouse.
EBT 16 Works Through Douglas Summit.