A pair of EMD motors shove the rear of the an empty coal train between Beshoar and Barela as the crew trucks towards their final destination of Trinidad.
Crawling at a whopping 10 MPH, this heavy coal load is finally done doing the three hour battle up the northern slope of the Palmer Divide. Here, the engineer begins to watch his train crest the s... (more)
With a storm cell working in the background, the DP motors of an empty coal drag charge their way up the Palmer Divide as they roll through the city of Colorado Springs.
After a thunder storm rolled through Trinidad, the clouds broke free in time for the sun to shine on this empty coal train returning to the Powder River Basin. Here, a shuttle crew rounds the hors... (more)
With an afternoon thunder storm rolling through in the background, an empty coal drag works its way through the curves between Mayne and Walsenburg along the former BN Spanish Peak Sub.