Jason Johnson preparing 6325 for its next run
#2 is waiting in the siding for the Bald Knob train to go by
about to cross under CSX indy line
shay #2 waiting at Cass depot for the passenger cars and shay #11 to come from the shops. They will push the train up the hill to avoid getting coal cinders on everybody
shays 2 and 11 work hard to push the train up the mountain
power is switching ends to push the train up to high falls, then pull it back to bellington
train stops about 3/4 way to the top for water, picture taken from aboard the train