Yard moves. The early evening sun drops below a dark cloud deck as Polson Logging Company Mikado #2 drops her freight consist in the south Garibaldi Yard and heads to the engine shop for wa... (more)
Symmetry in motion at Smith Lake. The morning mist has begun to give way to filtered sun as Polson Logging Co. Mikado #2 hauls a mixed freight north along the causeway at Smith Lake, just n... (more)
During the DVZO winter steam weekend, the locomotive Ed 3/4 # 2 "Hinwil" got stuck in the snow while manoeuvring to catch water on Saturday and had to be laboriously excavated by hand.
For the forthcoming winter steam weekend, on friday 25th January the line of the DVZO from Bauma to Bäretswil had to be cleared from snow and ice. 2-6-0 Ed 3/4 # 2 "Hinwil" is ready at ... (more)