Leaded by one Dash 9 and one of four Dash 8's that EFC have, that iron ore loaded train prepares to depart from siding#02. That is the last siding before the train arrives on his final point of th... (more)
View of SD70M's#715 engineer's control desk. Waiting for a meet at siding#02.
The first ES58ACi to be unloaded from the ship Industrial Egret, been placed over his truks.