ACE05 breaks the morning silence at Alviso with an F40 leading the way.
ACE train 103 heads down Altamont Pass with a pair of F40s for power.
A morning ACE train leaves the valley and passes over other commuters leaving the valley by way of Patterson Pass Road.
Crossing over the original 1915-built, Western Pacific Railroad bridge, ACE 6 ascends Altamont Pass as it heads east for its final destination of Stockton.
ACE 06 gently glides across the Alviso Bay Front on a cool March evening as the train travels UP Coast Sub to get to Stockton later in the night. Guillermo Sanchez © 2014
A northbound ACE train blasts under Hedding St and I-880 as it heads for CP Coast just ahead and eventually Stockton, CA.
The first northbound ACE train of the afternoon rush leans into a curve at Alviso.
An Altamont Commuter Express train makes its way north through Alviso. The sun has just poked its way through the clouds that have been hanging around all day. Nikon D70, 75-300mm.
The last ACE train of the afternoon rush pushes its train over Altamont Pass.
A double-headed ACE train pushes eastbound into the Centerville station in the late afternoon, heading for Stockton.
A doubleheaded ACE #2 pushes it way into Niles Canyon