FEC train 202 rumbles through the Nation's Oldest City on a very warm September morning.
The 202 arrives in a warm St Augustine during the tropical summer season.
FEC 105 wheels out of Bunnell with a little bit of manifest up front.
FEC 105 with uncommon loads on what is usually an intermodal train.
FEC 817 leads the 105 into Bunnell on time.
The 202 comes north with two LNG sets this morning
The 202 rumbles over the tidewater, with a double LNG set.
In morning sun the 202 rolls across the tidewater marshes.
The 105 makes it's way out of Bunnell with rock hoppers yet again in tow.
Dave Shelly the highest seniority engineer on the FEC brings 105 south out of Bunnell. The Grupo Tender is one of two on the FEC.
Happy November, FEC 105 slams through Dorena passing the middle Dorena signal. Once again 105 had hoppers up front.
FEC 202 rolls north on an unsettled morning in northeast Florida.
The 103 rolls through Bunnell with two LNG sets, one for New Smyrna. A careful observer will note Snowy Egret spooked by the train.
FEC 817, which is pulling train 103, has come to a stop on the main line so that the crew can swap with the crew on train 204. The FEC sometimes does these crew swaps so that each crew can return ... (more)
With the deadheading Geep, 101's power barely fits on the bridge over Spruce Creek.