Leaving Melbourne behind in its wake, three generations of EMD power LDP002, G513 and CLP9 power through Tottenham on the new section of double track with 7MB7 QRN service to Brisbane.
On their second trial run to Melbourne, brand new hired "Locomotive Demand Power" Downer EDI/EMD-built LDP002 and LDP001 lead dead attached CLP10 and CLP12 on the 7MB7 QRN service from Melbourne t... (more)
On their inaugural visit to Melbourne, the first two of Downer EDI's "Locomotive Demand Power" fleet of nine lease locomotives for QR National depart North Dynon on the return portion of their tri... (more)