Montana Rail Link's Logan local makes the once weekly run to Harrison, MT to work the single customer in town.
The Townsend local shoves back to their train in the siding after making a pickup off the main and with more work to do for a customer in the siding.
SPOLAU with a considerable assist into Livingston.
A helper set ran to Logan with a westbound train in order to drop off a motor swap with the local crew then assist a heavy eastbound back, taking with it the ailing motor from Logan. This is one ... (more)
Well now. So, here, a helper set is actually headed east on the rear of the SPOLAU from Logan back to Livingston with, of all things, a GP9 added. It evidently died on the 844 local and was repl... (more)
The Missoula Remote job is busy switching the east end of Missoula yard.