The 1430 Switcher shoves into Berth 200 Yard after working US Borax with PRLX 24 for power. The Badger Bridge can be seen on the right.
The 0500 Switcher shoves down the Gaffey Lead with a Progress Rail demo unit leading.
PRLX 24 leads the 6AM Switcher to KPAC with 3 reefers.
The Pacific Harbor Line Amerigas Job shoves under the 110 Freeway with a cut of cars that it will soon take up a grade to the Phillips Conoco refinery on the other side of the freeway.
Progress Rail demoPR24B continues testing on the Pacific Harbor Line, here seen on the Amerigas Job, returning on the Gaffey Street Lead under the Harbor Freeway.
The 0200 BNSF Dock Job doubles their train out of Mediterranean Shipping on a clear morning as UP crews work on either side of the Dominguez Channel. The EMD24B demo unit is the leader on this cre... (more)
The PHL 1400 Switcher switches Toyota and Lexus autos at Pier B in Long Beach with Progress Rail EMD24B demo unit PRLX 24 leading.
Is the Progress Rail EMD24B start of the next revolution of 4-axle locomotives? Only time will tell, but the first variation of this model is currently undergoing testing in revenue service on Pac... (more)
PRLX 24 in Cat paint awaits being delivered to the PHL at UP's West Colton yard.