Copper Basin Railway (CBRY) Copper Ore Train OT1 heads back to Ray Junction for another 48 loads of Copper Ore. They are seen here passing through Hayden, AZ.
Copper Basin Railway (CBRY) Copper Ore Train OT1 is seen here passing through Kelvin, AZ. Getting ready to head into Ray Mine to get 48 more loads of Copper Ore
Copper Basin Railway (CBRY) Copper Ore Train OT1 has just finished dumping their Train at the Hayden Smelter, they are seen here heading back to Ray Mine for another 48 loads of Copper Ore at Kelv... (more)
Copper Basin Railway (CBRY) Copper Ore Train OT1 heads back South to the Hayden Smelter on their last run of the day with 48 loads of Copper Ore. They are seen here pulling the hill at Kearny, AZ.
Copper Basin Railway (CBRY) Copper Ore Train OT1 heads back North to Ray Mine for another load. They are seen here rounding a curve at Riverside, AZ.
Copper Basin Railway (CBRY) Copper Ore Train OT1 heads back to Ray Junction for another load. They are seen here pulling the hill at Kearny, AZ.
Copper Basin Railway (CBRY) Copper Ore Train OT1 heads back to Ray Junction for another load. They are seen here passing through Hayden, AZ.
OT1 wastes no time hustling 45 cars of copper ore to the smelter at Hayden.
Loaded OT1 with locomotive #502 is seen shortly after departing Ray Mine running along Florence-Kelvin Hwy into Ray Junction.
OT1 heads towards Ray Mine as it dodges the shadows near tunnel #2.
OT1 heading back from the dumper to the yard. They will quickly change crews and head back to Ray Mine for the second trip of the day.