A Year Since Rebuild; Three Years Until Disposition/Sale: NS 7327 (rebuilt in April of 2016 from SD90MAC UP 8261) leads NS 22V east on Norfolk Southern Lehigh Line Track #2. By mid-2020, th... (more)
NS 22V comes through lower Annandale, NJ. Behind the leader are NS 9160 (C44-9W; rebuilt into AC44C6M NS 4479 in February of 2021) and NS 7704 (ES44DC).
A now-retired SD70M-2 leads NS 22V east on Conrail Lehigh Line Track #2. Behind the leader is NS 8959 (C44-9W) which within a year would be rebuilt into AC44C6M NS 4161 in May of 2018.
NS 22V approaching the end of Norfolk Southern's portion of the Lehigh Line on Track #2. Behind the leader are NS 9619 (C44-9W) and NS 1186 (SD70IAC). The bridge here still retains the right-of-wa... (more)
The "Dash 9" locomotives are quickly vanishing from Norfolk Southern's roster for the AC44C6M rebuilding program. NS 9413 leads the ever-colorful NS 22V east on Conrail Lehigh Line Track #2. The s... (more)