An empty coal train makes it's way west through Bluefield, Va on the very eastern end of the Pocahontas District.
83E crosses Coopers Trestle with a pair of EMD's leading tidewater loads.
Eastbound coal loads roll onto the massive bridge structure at Coopers, WV.
Eastbound coal loads cross the Bluestone River approaching Bluefield, Va.
Eastbound loaded coal train 83E exits Twin Branch #2 and crosses the Tug Fork.
NS 83E heads upgrade at Maybeury with a pair of SD70Aces for power. Passing by the old N&W Signals with a replacement base for a new Aluminum Cantilever.
There's nothing quite like a day at the Elkhorn Tunnel in the autumn.
Working east toward Bluefield on the former N&W, a pair of GE's lug a loaded coal train out of Flat Top Yard and under a set of CPL's at Falls Mills, Virginia.
NS 83E roars East through the little hamlet of Claren as he prepares to split the old N&W signals situated here.
Air troubles caused 83E to stall on the west slope of Coaldale Mountain.
In what earlier had been grain train 52V on the Pokey, crews tie the grain hoppers down and prepare to move a loaded coal train east out of Yards. The head engine is sitting literally on the WV/VA... (more)
NS 83E westbound smokes out of the twin Huger Tunnels with a load of mtys.
83E heads down the siding to Berea to pick up a cab signal equipped unit for a leader east.