Three MP15's and a train of loaded slabs rolls off of two southbound and onto the southbound main as they pass the old receiving yard.
In the late afternoon Union's 76 crew battles heavy shadows as it works up hill towards the Dravosburg tunnel and US Steels Irvin Works with a loaded slab train from ET.
76 crew, the slab train shoves up the low grade to head for USS Irvin works. In the background the massive Westinghouse Bridge crosses the valley 240' above the valley floor.
Some early morning fog lingers in the valley as a trio of MP15's trundle down into the bowels of the ET Works. They will emerge later in the day with a load of slabs bound for the Irvin works furt... (more)