BNSF's rotary works around the curve at MP 51 as they get in position to blow out the 2 cuts south of Stanton. You can see the backhoes working to pull snow down onto the track for the rotary. It ... (more)
BNSF's rotary works slowly thru the man made snow drift near MP 51 on the Zap Line. Crews worked most of the day digging out the 2 drifts along the tracks at MP 51 and piling the snow on the track... (more)