Engineer Jeff Ellingson in K-28 #478 waits for the order to move his train.
The beautifully restored 2-8-0 #315 looks almost toy like as it heads around the curve of the high line while it makes its way South to Durango on what is its first revenue run.
UP 119 blows its whistle as it nears Promontory to meet up with the Central Pacific's #60 for the eventful driving of the Golden Spike.
The late afternoon sun sends long shadows across the tracks bathing K-36 #486 in a yellow glow while it heads south towards Durango
D&RGW #315 poses on the turntable in its home yard of Durango for the first time in 58 years thanks to the efforts of the DRHS. It was an honor to light this scene.
Eureka & Palisade #4 the "Eureka" leaves the Durango roundhouse as the sun clears the mountain lighting up the yard and the Eureka as she heads towards the turntable.
The hostler waits to move 473 until the turntable operator lines up the correct track.
K-36 486 moves out for the first train of the day while 482 loads up with coal and waits for its turn.