Loaded iron ore train leading by two Dash9, which was loaded in Bicas mining. The front of first locomotive of the composition was completely vandalized.
P002 just arrived from Belo Horizonte in their final destination, this train was towed by a little locomotive to the Pedro Nolasco rail station because the Dash9 cannot passing by platform.