The Cando switchers have to pull well down the Fort Saskatchewan Industrial Lead before pushing back into the Dow Chemical Plant.
The Cando switchers have split their train as they push back into the Dow Chemical Plant
Thanksgiving weekend saw the last day of 2022 operations for Edmonton's High Level Bridge Streetcar. It was nice to see them using # 247, originally built for Hankai Electric Railway (Osaka) in ... (more)
CN 3235 and CN 2960 head westbound on the Wainwright Sub.
Cando Contracting travel on CN's Vegreville Sub with cars from the Dow Chemical plant in Fort Saskatchewan
VIA train #1 makes it's way westbound on CN's Wainwright Sub.
A trio of GP38-2s are on yard duty ay CloverBar.
A pair of SD30C-ECO head south with the Golden to Fort Steele wayfreight
CN 8934 heads an eastbound intermodal through Bretville Junction on the east side of Edmonton
On the last weekend of 2022 operations ex Melbourne tram #930 makes it's way south towards the High Level Bridge.
CP 5025 and 5003 take the Golden to Fort Steele local way-freight south on the Windermere Sub.
CP 8626 heads an eastbound intermodal around Morant's Curve and into the Bow River Valley on CP's Laggan Sub.
A pair of AC4400CWM and a pair of SD40-2 provide a lot of power for this work train heading south on the Windermere Sub. Seen rounding the sandstone cliffs just south of Radium the power is CP 80... (more)
CP 2275 and 2233 head east on the Lacombe Sub with the Tuesday's only local from Red Deer to Stettler.
CP 9358 and BNSF 4024 prepare to depart Scotford Yard with the mid day local transfer from Scotford to Edmonton.