After a two hour ordeal hooking up a pusher set to the front, giving 147 a total of eight engines, the move crawls toward the top of the grade. Fall has arrived in southern WV as the hills are a r... (more)
In a black and white scene that could easily be years ago, a high hood EMD along with a caboose on the rear await a clear signal from an old NW CPL. This engine had evidently been taken care of th... (more)
In a rainy scene, NS 147 has stalled on the wet grade at Elkhorn and has had the J52 pusher hook up. Dispatcher said she was used to this heavy train stalling, but with three on the rear and two o... (more)
With plenty of power in the background for Hill Runs and cabooses for mine runs, NS 2624 has just turned around on the wye at Elmore Yard. Forest fires from the drought give a smoky atmosphere to ... (more)