LA Times Delivery. After printing newspapers at its Olympic Blvd. location since it was built in 1988, the LA Times itself announced in late 2022 that the plant will shut down in 2024. The ... (more)
Under the control of a single GEVO, a San Antonio train for the Harbor pulls of the UP Alhambra Sub and onto Metrolink's River Sub on its way to the Alameda Corridor.
Grade Crossing Eliminated. Returning from the scrap move, the light engines head up the Bay Ridge Line. The face of the East New York Tunnel reads "City Of New York Grade Crossing Elim... (more)