Rebuilt with a chop nose, and a very large plow, after a derailment and roll-over on the isolated C&S Leadville to Climax branch, I believe, dedicated BN 6223 undergoes the final touches before re-entering service on the same line in August 1981. I never was able to photograph the branch in action, assuming that it was weekday operation only.