After a Chesapeake & Ohio SD50 arrived next to an empty CSX hopper train in Garrett, Pennsylvania, the train’s power was reconfigured. After the lead GP40 pulled onto the main line, it was coupled to the SD50, and they pulled forward to allow the trailing units to be placed on the main. The two units then coupled to the train, and are seen here ready to pull the train onto the main.