A trio of BNSF GE's lead manifest freight H GALDMO1 11A across the Mississippi River into Burlington, Iowa where it will pull into the yard for work before continuing west. This bridge was, built as a replacement between 2011 and 2012, consists of Five 250-foot fixed trusses, a 370-foot vertical-lift truss span, and two deck plate girder spans