P16-T395-T356 with an SSR works train near Macleod.
42103-S303-CLF1 shunt at Appleton Dock.
P14-EV120-T386 returning from an infrastructure evaluation run to Carrum approach Caulfield.
Streamliners 42103-GM10 work the AK test train to Maroona towards Altona Junction.
P14-EV120-T386 returning from an infrastructure evaluation run to Cranbourne at Oakleigh.
P17 and T386 running in push pull mode pass through Albion Junction with a rail train from the McIntyre Sidings.
CLF1 stabled with a rake of new SSR BGUY grain wagons at Appleton Dock.
CLF1-C501-CLF2 with 2MC5 empty SSR grain to NSW at Albion.
T381 leading an SSR works train from Warragul passes through South Kensington.
VL353-B80 with 9475 Maryvale paper train run past CLF1-44223-C501-CLF2 stabled with an SSR grain consist at Appleton Dock.
CLF1-C501-44223-CLF2 await departure from Appleton Dock with 1MC5 empty grain to NSW.
P17-T356-T381 with an SSR works train at Ascot Vale.
CLF1-S311-CLF4-CLF2 stabled with an SSR grain consist at Appleton Dock.
G539-BL30 run past CLF1-GM27-S311-CLF2 stabled with an SSR grain consist at Appleton Dock.
CLF4-S311-GM27-CLF1 hauling 7MC5 empty SSR grain to NSW pass through Albion at sunset.