Second outing of the CSXT OCS for 2022 sees the trio put back together again, today in the 1-3-2 configuration, is seconds away from the proper bridge over the river (which is largely cluttered) a... (more)
With a relatively clean rebuilt MAC leading, a run-through coal train to Georgia Power's RW Scherer Generating Station, is crossing the Etowah River on a warm Friday afternoon.