On the Beaver Cove job's southbound trip to Camp A Reload they made a detour to switch the railway's car shops at Nimpkish. They brought a string of bad order cars down from Siding 3 and are seen ... (more)
Quincy Railroad #5 crosses the valley before climbing the 4% grade to Quincy Junction with four loads from big lumber mill in Quincy, CA. There the crew will set out the loads for the UPRR local a... (more)
The day after winter solstice Quincy Railroad #5 drifts down out of the fog on the 4% grade near Quincy Junction with 9 empties for the big lumber mill in Quincy, CA.