Amtrak Cardinal stopped at Charlottesville.
BB 7 was originally built as Denver & Rio Grande Western GP40 DRGW 3062 in 1966.
Amtrak Cardinal departing Charlottesville.
Amtrak Cardinal arriving Charlottesville.
A late Amtrak Crescent arriving at Charlottesville.
NS SD70IAC 1214 leading southbound train 211.
NS DC to AC SD70ACC 1806 was originally built as NS SD70 2521 in 1993.
Distributed power units (DPU) shove on the rear of Duke Progress Energy empty coal hopper train 781 (Mayo Plant, NC - Shire Oaks, PA).
BB 6 was originally built as Penn Central GP40 PC 3217 in 1968.
Southbound at Control Point Charlottesville.
A three month old AC44C6M leading southbound train 211. NS 4381 was originally built as NS D9-44CW 9111 in 1997.