A Bessemer tunnel motor eliminates a plow ridge as it leads a train of empty ore cars out of Two Harbors for the Minorca plant near Virginia, MN. This area received around 3 feet of snow.
Two Bessemer tunnel motors sandwich a CN SD40-2W on the daily ore train bound for North Bessemer. The CN 5245 was brought in to temporarily replace BLE 905, which was damaged in a grade crossing i... (more)
Minntac loads howl through the curve at Iron Junction as they slow for the 10 mph switch at West Wye, where they will enter the Iron Range Subdivision.
A four-pack of Bessemer's finest bring a lengthy string of empty ore cars north across the Allegheny River Bridge. Arguably one of the most impressive railroad structures in the eastern U.S, the b... (more)